Construction Scheduling, Cost Optimization and Management
Auteurs : Adeli Hojjat, Karim Asim
Construction Scheduling, Cost Optimization and Management presents a general mathematical formula for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modelled. This book presents an entirely new approach to the construction scheduling problem. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization, including construction engineers, highway engineers, transportation engineers, contractors and architects. It will also be useful for researchers, and graduates on courses in construction scheduling and planning.
Date de parution : 12-2019
15.6x23.4 cm
Date de parution : 01-2001
Ouvrage de 280 p.
15.6x23.4 cm
Thèmes de Construction Scheduling, Cost Optimization and Management :
Mots-clés :
AISI Specification; neural; Construction Management Domain; dynamics; Radial Based Function Neural Networks; model; Change Order Management; change; Neural Dynamics Model; order; Global Optimum Design; project; Cold Formed Steel Beams; problem; Microsoft Foundation Class; non-repetitive; Construction Cost; tasks; Backpropagation Neural Network; network; BP Algorithm; Software; Software System; Varying Job Conditions; Cost Optimization; Critical Path; Information Model; Lyapunov Functional; CPM Analysis; State Dot; Concurrent Engineering; Validation Error; Cost Estimation; Pseudo-objective Function; Non-repetitive Tasks