Guide to Using the RIBA Plan of Work 2013
Auteur : Sinclair Dale
The RIBA Plan of Work 2013 is the definitive framework for the contemporary building design and construction process. It provides a stage-by-stage model to assist all members of the project team to manage the process from inception to completion and beyond. This practical guide explains how the RIBA Plan of Work 2013 can be applied for optimal results in construction projects, revealing the Plan of Work as much more than just a project framework. It can be used as a tool to ensure best outcomes and guide thinking across a range of key themes including whole life costs, procurement routes, BIM, and social and environmental sustainability.
With useful explanations of the various stages and technical terms, this book is packed with guidance and tips for using the Plan of Work to ensure genuinely integrated projects. Intended as complementary to the RIBA Plan of Work 2013 Online, the RIBA Job Book, and Assembling the Project Team, it is for construction professionals industry-wide, from architectural practices to clients and contractors, as well as students studying for their professional examinations.
Date de parution : 07-2013
21x29.7 cm
Disponible chez l'éditeur (délai d'approvisionnement : 13 jours).
Prix indicatif 49,62 €
Ajouter au panierThèmes de Guide to Using the RIBA Plan of Work 2013 :
Mots-clés :
RIBA Plan; procurement routes; OGC Gateway; whole life costs; RIBA Outline Plan; building information modeling; OGC; environmental sustainability; BIM Software; RIBA Plan of Work 2013; Site Waste Management Plan; Construction Operations Building Information Exchange; Collaborative Project Team; Design Responsibility Matrix; Task Bar; Project Execution Plan; BIM Model; Client’s Business Case; Jct Building Contract; Project Specific Plan; Professional Services Contracts; BIM; L2 BIM; UK Government; BIM Project; BIM Manual