Lavoisier S.A.S.
14 rue de Provigny
94236 Cachan cedex
FRANCE

Heures d'ouverture 08h30-12h30/13h30-17h30
Tél.: +33 (0)1 47 40 67 00
Fax: +33 (0)1 47 40 67 02


Url canonique : www.lavoisier.fr/livre/economie/capacitated-lot-sizing-problems-in-process-industries/descriptif_4130042
Url courte ou permalien : www.lavoisier.fr/livre/notice.asp?ouvrage=4130042

Capacitated Lot Sizing Problems in Process Industries, 1st ed. 2019

Langue : Anglais

Auteurs :

Couverture de l’ouvrage Capacitated Lot Sizing Problems in Process Industries

This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s). Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC). Mathematical models are proposed which are all encompassing that they can handle continuous manufacturing (as in process industries), and also situations where the setup costs and holding costs are product dependent and time independent/time dependent, with possible backorders, and with other appropriate adaptations.  Comprehensive heuristics are proposed based on these mathematical models to solve the CLSP-PCSC. The performance of the proposed models and heuristics are evaluated using problem instances of various sizes. This book also covers mathematical models developed for the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods, and with Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC). These models allow the presence of backorders and also address real-life situations present in process industries such as production of a product starting immediately after its setup and its uninterrupted production carryover across periods, along with the presence of short/long setup times. Heuristics proposed for the CLSP-PCSC can be extended to address the CLSP problem with sequence dependent setup costs and setup times. All the models and heuristics proposed in this book address some real-life considerations present in process industries.

Chapter 1. Introduction.- Chapter 2. CLSP: Real Life Applications and  Motivation to Study Lot Sizing Problems in Process Industries.- Chapter 3. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods (CLSP:PCSC): Mathematical Model 1 (MM1) and A Heuristic for Process Industries.- Chapter 4. Further Development: Mathematical  Model 2 (MM2) and A Comprehensive Heuristic for Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods for Peocess Industries.- Chapter 5. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods Assuming Sequencedependent Setup Times and Setup Costs (CLSP-SD-PCSC): Mathematical Models for Process Indusctries.- Chapter 6. Summary Concerning Theoretical Developments.
Ramya Ravi currently works in Caterpillar India Private Limited at Chennai, India. She completed Bachelor of Engineering in Electrical and Electronics Engineering at Sri Chandrasekharendra Saraswati Viswa Mahavidhyala University in 2008. She completed Master of Engineering in Industrial Engineering at Thiagarajar College of Engineering, Madurai (Anna University) in 2011. Thereafter, she received Ph.D. in Operations Management from IIT Madras in 2017. Her research interests include Supply Chain Management, Inventory Optimization, Production Planning and Scheduling, and Analytics. She has a publication in International Journal of Production Research, and she has attended international conferences, both in India and abroad. 

Chandrasekharan Rajendran is a Professor in the Department of Management Studies at IIT Madras, India. He holds RAGS Family Foundation Institute Chair in IIT Madras. He has been serving on the faculty of IIT Madras since 1987. His research interests include Operations and Supply Chain Management, Logistics and Distribution Management, Scheduling in Manufacturing and Service Systems, Optimization and Heuristic Techniques, Simulation Modeling, and Quality Management. He is a recipient of Alexander von Humboldt Research Fellowship of Germany and he is also a Visiting Professor in University of Passau, Germany. He has been conferred Dr. rer. pol. h.c. (Doctor of Business Administration and Economics (Honoris Causa)) by University of Passau for his outstanding achievements and contributions to research. He has been ranked among the best researchers, both in India and world-wide, in Operations Management. 

Hans Ziegler has his Diploma from University of Karlsruhe (TH) (now called Karlsruhe Institute of Technology), and PhD and Post-doctoral Habilitation from University of Paderborn. He had been on the faculty of Universities of Paderborn and Darmstadt, before moving to Unive

Examines Capacitated Lot Sizing Problems (CLSP) in process industries with products having long/short setup times

Highlights real-life scenarios/considerations in process industries such as production starting immediately after setup and uninterrupted production carryover across successive time periods

Develops mathematical models and heuristics to address a class of problems in CLSP present in process industries, along with such real-life considerations, and possible sequence-dependent setup times and costs

Date de parution :

Ouvrage de 196 p.

21x27.9 cm

Disponible chez l'éditeur (délai d'approvisionnement : 15 jours).

Prix indicatif 52,74 €

Ajouter au panier