Lavoisier S.A.S.
14 rue de Provigny
94236 Cachan cedex
FRANCE

Heures d'ouverture 08h30-12h30/13h30-17h30
Tél.: +33 (0)1 47 40 67 00
Fax: +33 (0)1 47 40 67 02


Url canonique : www.lavoisier.fr/livre/autre/sucker-rod-pumping-handbook/takacs/descriptif_3575078
Url courte ou permalien : www.lavoisier.fr/livre/notice.asp?ouvrage=3575078

Sucker-Rod Pumping Handbook Production Engineering Fundamentals and Long-Stroke Rod Pumping

Langue : Anglais

Auteur :

Couverture de l’ouvrage Sucker-Rod Pumping Handbook

Sucker-Rod Pumping Handbook presents the latest information on the most common form of production enhancement in today?s oil industry, making up roughly two-thirds of the producing oilwell operations in the world. The book begins with an introduction to the main features of sucker rod pumping and an explanation and comparison of lift methods. It goes on to provide the technical and practical knowledge needed to introduce the new and practicing production engineer and operator to the equipment, technology, and applications required to maintain optimum operating conditions. Sucker-Rod Pumping Handbook is a must-have manual that ensures operators understand the design, components, and operation of sucker rod pump systems, learn the functions of the systems, apply the fundamental production engineering theories and calculations, and accomplish maximum system efficiency by avoiding the typical pitfalls that lead to fatigue and failure.

1. Introduction to Sucker-Rod Pumping 2. Review of Production Engineering Fundamentals 3. Sucker-Rod Pumping System Components and Their Operation 4. Calculation of Operational Parameters 5. The Design of the Pumping System 6. The Analysis of Sucker-Rod Pumping Installations 7. Long-Stroke Sucker-Rod Pumping

Gabor Takacs is a professor and was head of the Petroleum Engineering Department at the University of Miskolc, Hungary from 1995 to 2012. He has more than 35 years of teaching and consulting experience in the production engineering field. He was acting director of the Petroleum Engineering program at The Petroleum Institute in Abu Dhabi, UAE from 2007 to 2010, and taught at Texas Tech University from 1988 to 1989. He is also currently a technical editor for an oil and gas journal, and received the Society of Petroleum Engineers Distinguished Lecturer award for 1995-96. Gabor regularly teaches short courses internationally and is a well-known consultant and instructor on production engineering and artificial lift topics. Gabor earned an MS and PhD degree in petroleum engineering, both from the University of Miskolc.
  • Covers basic equipment, techniques, and codes to follow in a comprehensive and easy-to-understand format
  • Helps users grasp common handling problems that lead to failures
  • Provides analysis of sucker rod pump installations, including well testing, dynamometer surveys, and modern interpretation methods
  • Aids operators in understanding and applying fundamental production theories and calculations of operational parameters

Date de parution :

Ouvrage de 598 p.

19x23.4 cm

Disponible chez l'éditeur (délai d'approvisionnement : 14 jours).

126,84 €

Ajouter au panier

Mots-clés :

Acoustic survey; Advantages; API pumps; API RP 11L; Artificial lift; Basic hydraulics; Continuous pumping; COROD (continuous rod); Counterbalancing; Cyclic load factor (CLF); Damping factor; Detection of pumping problems; Downhole gas separator; Dynamic behavior of rod string; Dynamometer card; Dynamometer card interpretation; Dynamometer survey; DynaPump; Electric motor; Equipment selection; Fatigue endurance; Fiberglass rod; Frictional pressure drop; Gas anchor; Gas lift; Gear reducer (gearbox); Gearbox torques; History of sucker-rod pumping; Horizontal flow; Inclined flow; Inferred production; Inflow performance; Intermittent pumping; Kinematics; Lifting capacity; Limitations; Long-stroke rod pumping; Maximizing pumping rate; Multiphase flow; Nodal analysis; Oilfield fluids; One-dimensional damped wave equation; Operating parameters; Optimization; Overview; Performance rating; Permissible load; PI; Pipe flow; POC controller; Polished rod dynamometer; Polished rod horsepower (PRHP); Poor-boy separator; Power requirement; Prime mover; Production capacity; Productivity index; Pump card; Pump components; Pump intake pressure; Pump leakage; Pump-off control (POC); Pump-off controller (POC); Pumping; Pumping efficiency; Pumping mode; Pumping unit; Pumping unit kinematics; Rod material; Rod string design; Rod string failure; Rotaflex; Simulation of the rod string's behavior; Single-phase flow; Solution of the wave equation; Special pumps; Standing valve test; Sucker rod; Sucker-rod connection; Sucker-rod pump; System efficiency; Systems (nodal) analysis; Tapered rod string; Thermodynamic parameters (oil; water; and gas); Traveling valve test; Troubleshooting; Tubing anchor catcher (TAC); Valve testing; Variable speed drive (VSD); Vertical flow; Water; Wave equation; Well analysis; Well inflow; Well potential; Well testing; Well weighing; Wellhead equipment