Lavoisier S.A.S.
14 rue de Provigny
94236 Cachan cedex
FRANCE

Heures d'ouverture 08h30-12h30/13h30-17h30
Tél.: +33 (0)1 47 40 67 00
Fax: +33 (0)1 47 40 67 02


Url canonique : www.lavoisier.fr/livre/autre/managing-productivity-in-construction/descriptif_4288031
Url courte ou permalien : www.lavoisier.fr/livre/notice.asp?ouvrage=4288031

Managing Productivity in Construction JIT Operations and Measurements Routledge Revivals Series

Langue : Anglais

Auteurs :

Couverture de l’ouvrage Managing Productivity in Construction

First published in 1997, this volume joined the debate assessing the potential of the Just-In-Time management philosophy from the manufacturing industry for Singapore?s construction industry by examining the "off-site" prefabrication of precast concrete components in Singapore, in comparison with traditional management systems. In the wake of the 1991 Strategic Economic Plan of Singapore, which forecasted alarmingly low productivity in the local construction sector, the authors noted that construction in Japan was 35% more productive, whilst Finland was 75% better. Highlighting immense potential for the JIT approach, they explore the JIT philosophy, traditional systems, construction wastes and comparisons between construction and manufacturing.

1. Introduction. 2. The Just-In-Time Philosophy. 3. Traditional Manufacturing Management Systems. 4. Comparison Between Construction and Manufacturing. 5. Just-In-Time Operations in Prefabrication. 6. Accounting for Construction Wastes. 7. Measuring Just-In-Time Wastes in Construction. 8. Conclusion.

Low Sui Pheng, Chan Yue Meng